Section III: Fill In The Blank - Complete the statements below by filling in the blank |
1. The Health Department recommends the pumping of septic tanks every three to years. |
2. The minimum allowable wall thickness for concrete septic tanks is inches. |
3. The minimum sized septic tank shall be gallons. |
4. The Health Department may at any time, require any or all septic tanks to be checked for leaks by requiring tanks to be (2 words). |
5. The inlet baffle should extend approximately inches below the liquid surfaces. |
6. The outlet invert of the septic tank must have a minimum of inches of fall from the tank inlet invert. |
7. will be the likely outcome of a drainfield, should sludge be allowed to travel freely into it. |
8. areas of the tank contain a scum layer. |
9. Generally, the area of the tank contains sludge. |
10. For each additional bedroom in a residence, exceeding four bedrooms, the tank size should be increased by gallons. |
11. The outlet baffle to the drainfield should extend (%) percent into the liquid level of the tank. |
12. The outlet pipe between the septic tank and the distribution box must be a solid pipe having a pound crush strength. |
13. All tanks must be covered by at least inches of soil. |
14. Risers must be installed on all septic tanks which are more than inches below the finished grade. |
15. The septic tank contains compartments. |
16. Separate the distribution box from the graveled drainfield trench by a minimum of feet of solid pipe. |
17. Sewage systems are not allowed where slopes exceed %. |
18. A sewage system cannot be backfilled until it has been inspected by the Health Department and tagged. |
19. If a distribution box is placed so that there is a direct flow from the distribution box inlet to any drain line, a must be installed. |
20. Header lines must be constructed of solid line and should be laid at a grade. |
21. The minimum crush strength of drainfield pipe is pounds crush strength. |
22. The maximum drainfield trench depth shall not exceed inches. |
23. The minimum depth of drainfield cover is inches. |
24. The minimum separation between two drainfield trenches shall be feet, edge to edge. |
25. All joints of pipe and fittings should be to hold them in place. |
26. What is the square footage of a drainfield that has 4 drainfield lines, each line is 67’ long and 3’ wide? sq feet. |
27. Drainfield gravel must be and be free of fines. |
28. All sewer lines should have a in- stalled to clear lines of potential clogs. |
29. When crossing a road with a tight line the type of pipe required should be equal to or greater than strength of pipe. |
30. The size of the drainfield rock must be inches to inches at the longest dimension. |
31. Distribution boxes must be tested. |
32. In a four line drainfield, each line should receive % of the total flow. |
33. If there is public sewer within feet of the dwelling, you may be required to connect to sewer. |
34. The covering over the drainfield trench gravel to prevent soil from entering the gravel is called |
35. The grade of the drainfield line shall not exceed in feet, while lines are preferred. |
36. What is the maximum width of a drain field trench that is allowed? feet. |
37. distribution of drainfield lines is required. |
38. The maximum length of each gravity flow drainfield line shall not exceed feet. |
39. The maximum depth of cover over a drainfield line shall not exceed inches. |
40. The minimum distance between drainfield gravel and the distribution box is inches. |
41. If a permit requires 900 square feet of absorption area, and you use a 3' (three feet) wide trench, 4 (four) line system, each drainfield line will be long. |
42. The non perforated pipe from the building to the septic tank should be laid at grade. |
43. A conventional gravity flow drainfield system requires feet of separation between the trench bottom and a restrictive or impermeable layer or ground water. |
44. feet is the minimum distance from the septic tank to the absorption system. |
45. feet is the widest drainfield trench that can be used in computation of the trench absorption area. |
46. There shall be a minimum of disposal lines in a sewage waste disposal system. |
47. An system must be provided on an electrical circuit separate from the pump to indicate a pump failure. |
48. A minimum inches separation between the bottom of the pump chamber and the pump intake is required. |
49. A disconnect union that is accessible when the pump chamber is flooded and a valve immediately on the discharge side of the pump chamber and the pump intake is required. |
50. If a riser is used on a pump chamber, the effluent discharge line shall exit through the wall. |
51. The lid of the pump chamber shall be located inches from the surface grade. |
52. The minimum riser diameter for pump chambers is inches. |
53. The effluent pump chamber shall provide additional storage volume of gallons multiplied by the number of bedrooms. |
54. The dosing volume shall be delivered to the drainfield within minutes from the beginning of each cycle. |
55. The minimum size of a residential on-site sewage system shall not be less than bedrooms in size nor have less than square feet of drainfield. |